North Vancouver split level custom home full-gut reno project that included the following elements:

  • 3 bathrooms, powder room, kitchen, laundry.

  • High-pressure gas system with multiple appliances/fixtures

  • Navien combi boiler paired with a fan-coil heating system (limited mechanical room size)

  • Full-home carbon filter system

  • IBC boiler for pool system

  • Backup generator

  • "Under-mount" bathtub

  • Steam shower

  • Toilet with bidet seat

  • Air jet bathtub

  • Powder room lav with wallhung faucet and custom stone sink

Edgemont Full Home  Renovation

This was a challenging yet rewarding project due to the large number of uncommon elements as well as the use of high-end plumbing fixtures with delicate finishes. 

 Some of the challenges overcome in this project were:

>>

Capilano Rd. Island Tub Drain Correction

​

Renovation takeover from another plumbing company. Large, heavy, composite material bathtub to be installed in a snug alcove (less than 1/2" gap on either end), but drain roughin was over an inch off. Floor was slab-on-grade. Previous plumbers could not find a solution.

 

We decided the best solution was to open the floor and move the drain to the correct location. It was a delicate operation because we would need to cut the tile and open the floor, but the tub could not be safely moved out of the room, and the hole that we cut would need to be small enough to be covered by the tub. We also ran a thermal scan of the floor and found that Nuheat wire was installed under the tub, coming to within a few inches of the drain. So we took careful measurements to calculate the correct drain location, protected the tub and nearby finished surfaces, and marked the wire location on the floor. The tile was cut carefully and the drain roughin extracted, then reinstalled with a new ptrap in the correct location. The tub was then moved into place, connected to the drain, and tested. The fit and function

was perfect! 

 

This was a rewarding project because its execution required considerable thought, patience, and finesse. Also it was satisfying to find a solution where others had failed repeatedly. And the clients were thrilled.

Boiler replacement and mechanical room makeover project.

​

Existing Veissmann boiler was irreparable and replaced with Navien combi boiler. Existing mechanical room had drainage pipes running across the room at head-height, a defunct secondary storage tank heater, and a confusing mess of poorly supported heating and water lines. Existing vent terminal was also right next to the front door.

 

On the first day I was able to adjust the drain lines, remove the existing boiler, mount the new one, run new vent lines, and get domestic hot water back on-line. Over the course of the following 2 days the heating system was completed and commissioned.

Deep Cove Mechanical Room Makeover

Thanks for looking at some of the projects we worked on!

*

Do you have an upcoming project requiring professional plumbing or gasfitting services?

* Featured projects were completed by Vojtech Prilesky during previous employment.

SWORDFERN_B1_SH.png

SWORdFERN PLUMBING

Email | contact@swordfernplumbing.ca

Business hours Monday to Friday 8:00am - 4:00pm

Phone |  604-442-3573

North Vancouver, BC, Canada

©2024 Swordfern Plumbing   |   Design by Valentina Mena Rojas

bottom of page